TOPLogin | Register | Last played
Detective Declassified ColorRoom Confined Task BlackRoom Mr.snoozleberg Adventure Mystery Warner MillerVilla Wild 
 
Like with 《Chicken Grow

First

Second

Third

More
     
    [Chicken Grow] introduction
    95
    31
    Operation
      More Remark  
    1st, quantity water: Left side (1) turns on
    switch above the barrel to meet the full water right side, then leads
    to the bucket water valve switch (altogether three) all to open, then
    hits the mark between the four square shapes switch left side, the
    current of water to in the right side barrel, then opens in the barrel
    switch to meet again the full water right side, then turns on the
    square switch to flow to the barrel, by now because right side in the
    barrel water has surpassed the spacing right side, the volunteer fire
    brigade automatic escape, had first to close under the barrel switch
    by now, prevents when met the flood water the volunteer fire brigade
    to run away. (2) left side in present barrel surplus small water
    diversion, flows in again this water diversion to in the right side
    barrel left side, then turns on in the barrel switch again right side,
    again turns on the square switch to flow in the barrel, if succeeds,
    the volunteer fire brigade drop arrives in on bowl, the bird can come
    to drink water. 2nd, 华容 said that, makes concrete does
    according to the under chart: